產(chǎn)品展示
聯(lián)系我們
聯(lián)系人:麥女士
手機:+86 15270269218
電話:
Q Q:3136378118
郵箱:stodcdcs@gmail.com
地址:江西省九江市瑞昌市東益路23號賽湖農(nóng)商城401號
TC810N-1013
時間常數(shù):動態(tài)組件(如傳感器或控制系統(tǒng))對其輸入的瞬時(或“階躍”)變化達到總響應(yīng)的63.2%所需的時間。通常用于判斷組件或系統(tǒng)的響應(yīng)性。雙位控制:請參閱開/關(guān)控制。零能帶:一種節(jié)能技術(shù),允許溫度在選定的設(shè)置之間浮動,從而防止溫度在此范圍內(nèi)時加熱或冷卻能量的消耗。分區(qū):將建筑物劃分為若干部分進行供暖和制冷控制的做法,以便一個控制器足以確定供暖和制冷
60 0 130 190重置時間表HW設(shè)定值OA溫度160 159 148自動41輸入輸出30%開閥蒸汽流量室外空氣室外空氣控制點熱水回流熱水供應(yīng)熱水供應(yīng)溫度控制介質(zhì)控制變量測量變量M



Time constant: The time required for a dynamic component, such as a sensor, or a control system to reach 63.2 percent of the total response to an instantaneous (or “step”) change to its input. Typically used to judge the responsiveness of the component or system. Two-position control: See on/off control. Zero energy band: An energy conservation technique that allows temperatures to float between selected settings, thereby preventing the consumption of heating or cooling energy while the temperature is in this range. Zoning: The practice of dividing a building into sections for heating and cooling control so that one controller is sufficient to determine the heating and cooling
60 0 130 190 RESET SCHEDULE HW SETPOINT OA TEMPERATURE 160 159 148 AUTO 41 INPUT OUTPUT 30 PERCENT OPEN VALVE STEAM FLOW OUTDOOR AIR OUTDOOR AIR CONTROL POINT HOT WATER RETURN HOT WATER SUPPLY HOT WATER SUPPLY TEMPERATURE CONTROLLED MEDIUM CONTROLLED VARIABLE MEASURED VARIABLE M
相關(guān)產(chǎn)品